Where is hs2 going in Cheshire?

Author

Emma Newman

Updated on March 11, 2026

The HS2 route comes back into Cheshire East in the north of the Borough. A series of continuous viaducts start at Wade Brook in Cheshire West, then over the existing Mid Cheshire railway line and over the junction of the A556 and A559.

Also asked, where does the hs2 go through?

The new HS2 high speed line will provide fast, frequent and reliable connections between 8 out of Britain's 10 largest cities and their regions: Birmingham, London, Leeds, Manchester, Liverpool, Sheffield, Edinburgh and Glasgow.

Furthermore, what is the planned route of hs2? Phase 2b - Crewe to Manchester and West Midlands to Leeds

On the maps you can view the: eastern leg - proposed route from the West Midlands to Leeds. western leg - proposed route from Crewe to Manchester.

Similarly, it is asked, will my property be affected by hs2?

It's clear that the impact of HS2 on property prices is still somewhat unknown. However, it's likely that in the short term, properties closest to the planned route will be negatively affected. However, over the long-term houses near to the line (but not directly on it) are likely to see their property values increase.

Will hs2 stop at Crewe?

Under the current preferred route, the HS2 line will stop at Crewe, forming a HS2 Hub Station on the site of the existing station. Crewe would receive two HS2 services to London per hour, with a journey time of just 55 minutes, cutting 30 minutes off the existing journey time of 90 minutes.

Related Question Answers

How many homes will hs2 destroy?

900 homes

How fast will hs2 trains be?

250mph

How noisy will hs2 be?

The government believes 250mph trains could be available by 2020. Despite an absence of official numbers, the chairwoman of the Stop HS2 group, Lizzy Williams, estimates at 50m from the track, the noise from the trains will be "between 95 and 97 decibels every two minutes if the line runs at capacity".

Which government started hs2?

In January 2009 the New Labour government established High Speed Two (HS2) Limited (HS2 Ltd), chaired by Sir David Rowlands, to examine the case for a new high-speed line and present a potential route between London and the West Midlands.

Will hs2 go through Sheffield?

Transforming connectivity

The Government has confirmed that Sheffield city centre will be directly connected to HS2 and Sheffield Midland Station. HS2 will run from London to Birmingham, then on to Manchester and Leeds, calling at Sheffield. This will reduce Sheffield's journey times to London by 40 minutes.

Is the hs2 going ahead?

HS2 will go ahead alongside radical improvements to local transport networks all across the country, the PM confirmed today. In a statement to Parliament he set out that after careful consideration of the independent Oakervee review, the decision has been taken to proceed with HS2.

How many stations will hs2 have?

25 stations

Why is hs2 so expensive?

2) Risk and uncertainty. When you start planning a major infrastructure project such as HS2, experts are supposed to make informed estimates about the amount of time and money needed to complete each phase. And that's why the price tag for the second phase of HS2 is not certain.

Will hs2 increase house prices?

However – and if the Crossrail experience is anything to go by – properties within a 10- to 15-minute walk away from an HS2 station will see house prices go up by 30% to 60% more than the prices of property “not in an area of immediate impact” as that is described by Brett Alegre-Wood of property investment company

Does hs2 go through Amersham?

The route of HS2 directly affects Amersham and our neighbouring towns, villages and countryside. These include Denham, Chalfont St Peter, Chalfont St Giles, Little Missenden, Great Missenden, Hyde Heath and South Heath, Potter Row, The Lee, Wendover, Stoke Mandeville, Stone, Waddesdon, Quainton, Calvert and Twyford.

Will hs2 be underground?

Alternative plans for HS2 would see vast underground station built at Piccadilly and trains running under Manchester. Although the new HS2 line would approach the proposed terminus below ground, the terminus itself would be above ground level.

Who is funding hs2?

It is funded by grant-in-aid from the government. HS2 Ltd is an executive non-departmental public body, sponsored by the Department for Transport.

How long will the hs2 take from London to Birmingham?

one hour 21 minutes to 49 minutes

How long is the hs2 route?

The proposed London to Birmingham line will be about 140 miles (225km) long and the total Y network will be around 330 miles (531km) long.

Will hs2 carry freight?

Meanwhile HS2 trains will be able to carry 576,000 people per day, reducing overcrowding on the existing network. Space will be created for 144 extra freight trains per day, which could carry over 2.5 million lorries' worth of cargo each year.

Does hs2 go through Milton Keynes?

HS2 unlocks a massive amount of space on the existing railway by giving the long distance services their own pair of tracks. Once HS2 is operating, those long distance services that currently fly through Milton Keynes, Bletchley and Wolverton can be replaced with new trains that serve local and regional needs.

Will hs2 connect to hs1?

High-Speed for Air (HS4Air) is a suggested new high-speed railway that would connect the existing HS1 with the planned HS2, linking both Gatwick and Heathrow airports with a connection to the Great Western Main Line railway (GWML).

Will hs2 go to Liverpool?

HS2 trains will serve Liverpool Lime Street and Runcorn stations. These will become 'integrated high speed stations', where passengers can catch HS2 trains and access the high speed network to the south. Over 15,000 passengers a day will be able to travel on the high speed network to and from Merseyside.